Termite Control Tenting for Dummies

Not known Facts About Termite Control Tenting


Many new buildings use a termicide treated coating of dirt surrounding and under the building. This forms an integrated barrier, together with the physical techniques mentioned above. The termicide is placed on the soil under the slab and around the footings, pipes, conduits and other structures of the house during construction to create a vertical barrier.

Timber used to construct homes, outbuildings, fences and other outdoor structures can be treated with chemicals. These are commonly referred toas treated timbers and should be considered at the time of designing or constructing the buildings.

The Ultimate Guide To Termite Control Technician Job Description


To successfully incorporate termite barriers into existing buildings, strategic drilling through concrete slabs, porches, flooring and wall footings may be needed, as well as under ground treatment.

Building and Energy recommends only licensed pest controllers carry out this work. Chemical baits Strategically put bait stations can be used to lure termites into a food source, such as dry wood or paper deny. About 30 bait stations are needed for a normal house and they need to be inspected often to evaluate termite activity. .

Once the termites are attracted to the bait station, a particular termicide is inserted that sticks into the termite.

Examine This Report about Termite Control Technician Job Description


To deal with termites in the garden, specialised pest managers drill into timber or the trunk of a tree to insert temperature probes which help to locate the termite nest.  Despite regular inspections of the garden, termites can still enter your house. In the house, first indicator may be a small discolouration of a wall , followed by warping if wood panelling is used to line the wall.

Make care to investigate the dimensions and nature of the issue as well as the options available for termite eradication. .

Whichever system you select, it is important to do routine inspections in particular inspect your house every six months for any apparent signs of infestation. Building and Energy recommends you arrange for an inspection by a licensed pest control operator at least once per year to look for signs of infestation and to undertake any preventative steps. .

Indicators on Termite Control Tenting You Need To


For existing buildings, where you have found signs of infestation, chemical treatment is typically the only option for destroying the termite nest. This treatment can include re-establishing a compound and/or physical barrier plus regular inspections to discover any ongoing or new termite action.

Treatment with a termicide into tunnels of this nest where termites are known to be more active can reduce numbers, but it seldom eliminates the colony entirely unless it's used in conjunction with another method.

Some Of Termite Control Techniques


When buying an existing house, Consumer Protection recommends including a White Ant Certificate clause in the Offer and Acceptance form. This is intended to make certain the residence is free of termites and there's no structural damage from any prior infestation. A separate fact sheet about the need for timber pest inspections and reports when buying property is available from the Department of Commerce by contacting the Consumer Protection Advice Line on 1300 304 054. .

If you are constructing a new house or building or renovating an existing one you will need to comply with the termite risk management and barrier requirements of the National Construction Code (NCC) and relevant standards. In the majority of cases a building permit will be needed before carrying out building work and the facts of the type of termite barrier should be filed as part of the building permit application process.

10 Simple Techniques For Termite Control TentingGet This Report about Termite Control Technician Job Description

How Termite Control Tenting can Save You Time, Stress, and Money.


The NCC requirements aim to decrease the possibility of termite damage to main building elements which are mainly the structural elements of a building butdo not include non-structural elements like cabinet work and furniture.

It's a requirement of the NCC a lasting notice be permanently fixed to the building in a prominent location, including in a meter box or the like. The notice should indicate the kind and method of termite risk management and the date the system has been installed, along with the installers or manufacturers recommendations for the scope and frequency of future inspections.

For article specific advice about termite protection for a proposed new residence, contact a building surveyor, a contractor or builder or a licensed pest control professional.

Not known Details About Termite Control Tenting


If you have had building work completed in the past six years and the contractor did not offer termite protection as needed from the NCC, you can refer the issue to the Building and Energy.

Plumbing leaks, drainage problems and roof leaks should all be dealt with quickly, as moist conditions bring termites.

All About Termite Control TentingFascination About Termite Control Tenting

6 Simple Techniques For Termite Control Technician Job Description


Garden beds and plants should be kept away from direct contact with walls. Hard paving should be substituted.

Leave a Reply

Your email address will not be published. Required fields are marked *